0.76.1
triggerdotdev/trigger.dev0.76.1Jul 13, 2026by takahirom
AI Summary
A rendering-only fix for the scenario graph to ensure the visual representation matches the actual runtime execution order of dependencies.
Key Highlights
- Fixed dependency edge drawing to start from the last reusable call node.
- Visual distinction between dashed edges (reusable calls) and solid edges (dependents).
- Applies to both CLI (`arbigent graph`) and the UI scenario graph dialog.
Full Release Notes
## Clearer Scenario Graph Rendering This is a rendering-only fix for the scenario graph introduced in 0.76.0 — nothing changes in how scenarios actually run. When a scenario had reusable calls, its dependents were drawn branching off in parallel with the calls, which didn't match the actual execution order (dependents run after the calls complete). The graph now draws the dependency edge from the last reusable call node, so the drawing matches what already happens at runtime: Before: ```mermaid graph LR classDef reusable fill:#e8f0fe,stroke:#4285f4 n0["login-flow"] n1["premium-content<br/>Play premium content"] n2[["login (user=paid)"]]:::reusable n0 -.-> n2 n0 --> n1 ``` After: ```mermaid graph LR classDef reusable fill:#e8f0fe,stroke:#4285f4 n0["login-flow"] n1["premium-content<br/>Play premium content"] n2[["login (user=paid)"]]:::reusable n0 -.-> n2 n2 --> n1 ``` Dashed edges are reusable calls made by the scenario; solid edges are dependents. This applies to both `arbigent graph` (Mermaid output) and the scenario graph dialog in the UI. ## What's Changed * Start dependency edges from the dependency's last call node in scenario graph by @takahirom in https://github.com/takahirom/arbigent/pull/396 **Full Changelog**: https://github.com/takahirom/arbigent/compare/0.76.0...0.76.1